Development and decoration of the comprehensive hu

2022-07-22
  • Detail

Recently, the airport group issued a bidding announcement for the procurement of aluminum alloy plates, which means that the new T3a terminal, integrated transportation hub and ITC building will soon enter the stage of interior decoration, revealing its internal structure to the public

the bidding announcement shows that the aluminum plate procurement project of the new T3a terminal, integrated transportation hub and ITC building includes the procurement of aluminum alloy plates used in the interior decoration and curtain wall works of T3a terminal, integrated transportation hub and ITC building

it is understood that T3a terminal is located in the east of the existing terminal area, which is composed of the central hall of the main building and four corridors a, B, C and D, with a total construction area of about 530000 square meters. Among them, there are four floors above the ground, and the main building has two basements

the comprehensive transportation hub (GTC) is located in the south of T3a terminal, which is composed of airport transportation hub, airport T3 terminal station of rail line 10 (hereinafter referred to as subway station), intercity railway and interval tunnel civil engineering reservation works (hereinafter referred to as urban railway station), with a total construction area of about 340000 square meters

among them, the airport transportation hub is about 250000 square meters, with three floors above the ground and two floors underground. The subway station is an underground Island Station, which is located above the urban railway station. It is a two-story underground station with a construction area of about 30000 square meters. The urban railway station (including the interval tunnel) is about 0.96 km long, with three underground floors and a construction area of about 60000 square meters

the newly-built ITC building is located in the southwest of T3a terminal, close to the a corridor of T3a terminal. One floor underground and six floors above the ground, with a total construction area of more than 15000 square meters

zhangmingjin, executive deputy commander of Chongqing Airport expansion headquarters, said that after the completion of the new terminal, Jiangbei Airport will meet the passenger throughput of 45million people. Any aircraft type, including the giant of civil aviation, such as A380, can take off and land unconditionally

宁波妇科医院

昆明试管婴儿医院

杭州男科医院

Copyright © 2011 JIN SHI